Give us a call or request a quote
  • Location
    23 Shaban Street, Albion Park Rail
  • Opening Hours
    Mon - Fri 6.30am – 4.30pm & Sat 7am –12pm
  • Phone No.
    4257 1196

New to site?


Login

Lost password? (close)

Already have an account?


Signup

(close)
Home NRG Stud Fixing & Washers
  • NRG Stud Fixing & Washers
  • NRG Stud Fixing & Washers
NRG fixing requirements

NRG Stud Fixing & Washers

Timber Fixing and Metal Fixings

NRG Stud Fixing & Washers

NRG Stud Fixing & Washers; Using screw mechanical fixings, (see Screw fixing table 1.0) in combination with foam glue adhesive, place NRG Greenboard into position, ensure all air pockets from foam glue adhesives are pressed out. Firmly apply pressure to Greenboard, then mechanically screw/washer fix, through 1st layer of NRG Greenboard panel, into wall structure.

40mm
10.8 x 65mm
55mm

60mm
10.8 x 100mm
75mm

75mm
10.8 x 100mm
90mm

100mm
10.8 x 125mm
125mm

For further information on product applications and/or specifications, follow the Installation Guide